Lakeview Waterfront Connection Environmental Assessment Amendment
Environmental Assessment Amendment for the new construction access road to the Jim Tovey Lakeview Conservation Area.
Environmental Assessment Amendment for the new construction access road to the Jim Tovey Lakeview Conservation Area.
Appendices for mandatory notices for the Jim Tovey Lakeview Conservation Area Environmental Assessment Amendment.
Report documenting Phase 3 of the Natural Heritage System Strategy for the Credit River Watershed. Phase 3 includes developing the methodology for and identifying a Credit River Watershed Natural Heritage System that integrates terrestrial and aquatic components.
Appendix A of “Credit River Watershed Natural Heritage System: Final Technical Report”. Includes maps associated with development and identification of the Credit River Watershed Natural Heritage System for Phase 3 of the Natural Heritage System Strategy.
Summary version of “Credit River Watershed Natural Heritage System: Final Technical Report”.
Report documenting Phase 4 of the Natural Heritage System Strategy for the Credit River Watershed. Phase 4 includes the recommendations for implementation of the Credit River Watershed Natural Heritage System, including short term, long term, and ongoing actions.
Document outlining answers to frequently asked questions relating to the Credit River Watershed Natural Heritage System, it’s development, and how it will be implemented.
This guide’s aim is to provide information and guidance to residents to help retrofit residential lands with low impact development practices.
Residential low impact development retrofit field assessment form
This guide provides the reader with a thorough understanding of certification protocols for low impact development bioretention practices.
Overview of CVC’s Showcasing Water Innovation Project.
This discussion paper was prepared for participants in the Roads and Runoff workshop to provide background and introduce potential barriers and solutions for consideration.
CVC is committed to continually improving the accessibility of its programs and services. Review our accessilbity plan.
Report outlining key demographic census-based data across CVC’s jurisdiction.
Terms of Reference sets out the work plan for preparing the Environmental Assessment and carrying out the required public consultation for the Jim Tovey Lakeview Conservation Area.
This document outlines how CVC and Region of Peel, with support from the City of Mississauga and TRCA are proceeding with the Environmental Assessment for the Jim Tovey Lakeview Conservation Area project.
Summary of natural, cultural, social and economic information for Belfountain Conservation Area