IMAX Case Study
Overview of the IMAX parking lot retrofit project that included a variety of innovative low impact development.
Overview of the IMAX parking lot retrofit project that included a variety of innovative low impact development.
Monitoring plan for Elm Drive low impact development retrofit project evaluating the effectiveness of bioretention trenches.
Overview of Unitarian congregation study where a drainage depression was upgraded to a bioretention cell.
Overview of CVC Head Office low impact development retrofit project featuring permeable pavement and rainwater harvesting.
Overview of Lakeside Park, a green infrastructure demonstration site at Mississauga’s waterfront.
Overview of Central Parkway low impact development retrofit project featuring Silva Cell technology.
Overview of Portico Community Church parking lot retrofit featuring permeable pavers and two bioswales.
Overview of Silt Smart Real-Time Erosion and Sediment Control Monitoring Program.
Overview of O’Connor Park retrofit project featuring bioretention cell, permeable pavement and infiltration trenches.
This report supports an application for a stormwater credit for the Credit Valley Conservation head office.
Technical report of Central Parkway road right-of-way low impact development retrofit project monitoring results.
PDF of Case Study- LID- Green Glade for teacher activity guide for Low Impact Development climate change solutions series.
Technical report of CVC Head Office low impact development retrofit project monitoring results.
PDF of Case Study- LID- Green Glade for teacher activity guide for Low Impact Development climate change solutions series.
Technical report of Elm Drive road right-of-way low impact development retrofit project monitoring results.
PDF of Case Study- LID- Green Glade for teacher activity guide for Low Impact Development climate change solutions series.
Technical report of Lakeview road right-of-way low impact development retrofit project monitoring results.
Results of Meadows in the Glen low impact development (LID) groundwater monitoring program that evaluated the effects of LID on groundwater.
Environmental Assessment Amendment for the new construction access road to the Jim Tovey Lakeview Conservation Area.
Appendices for mandatory notices for the Jim Tovey Lakeview Conservation Area Environmental Assessment Amendment.
Overview of CVC’s Showcasing Water Innovation Project.