Technical Report

IWMP Technical Report: Status and Trend Analysis of Land Cover and Land Use

IWMP Technical Report: Status and Trend Analysis of Land Cover and Land Use Continue Reading

This report describes the status and trends of land cover and land use in the Credit River Watershed based on data collected between 2002 and 2017.

IWMP Technical Report: Status and Trend Analysis of Land Cover and Land Use Continue Reading

Last modified:
2022-10-14

IWMP Technical Report: Status and Trend Analysis of Stream Benthic Macroinvertebrate Community

IWMP Technical Report: Status and Trend Analysis of Stream Benthic Macroinvertebrate Community Continue Reading

This report describes the status and trends of the stream benthic macroinvertebrate community in the Credit River Watershed based on data collected between 1999 and 2016.

IWMP Technical Report: Status and Trend Analysis of Stream Benthic Macroinvertebrate Community Continue Reading

Last modified:
2022-10-14

IWMP Technical Report: Status and Trend Analysis of Stream Fish Community

IWMP Technical Report: Status and Trend Analysis of Stream Fish Community Continue Reading

This report describes the status and trends of the stream fish community in the Credit River Watershed based on data collected between 1999 and 2015.

IWMP Technical Report: Status and Trend Analysis of Stream Fish Community Continue Reading

Last modified:
2022-10-14

IWMP Technical Report: Status and Trend Analysis of Stream Water Chemistry

IWMP Technical Report: Status and Trend Analysis of Stream Water Chemistry Continue Reading

This report describes the status and trends of stream water chemistry in the Credit River Watershed based on data collected between 1964 and 2016.

IWMP Technical Report: Status and Trend Analysis of Stream Water Chemistry Continue Reading

Last modified:
2023-03-27

IWMP Technical Report: Status and Trend Analysis of Stream Water Temperature

IWMP Technical Report: Status and Trend Analysis of Stream Water Temperature Continue Reading

This report describes the status and trends of stream water temperature in the Credit River Watershed based on data collected between 2004 and 2016.

IWMP Technical Report: Status and Trend Analysis of Stream Water Temperature Continue Reading

Last modified:
2022-10-14

IWMP Technical Report: Status and Trend Analysis of Streamflow

IWMP Technical Report: Status and Trend Analysis of Streamflow Continue Reading

This report describes the status and trends of streamflow in the Credit River Watershed based on data collected between 1960 and 2019.

IWMP Technical Report: Status and Trend Analysis of Streamflow Continue Reading

Last modified:
2022-10-14
Size:
13.18 MB

IWMP Technical Report: Status and Trend Analysis of Tree Health and Dead Wood

IWMP Technical Report: Status and Trend Analysis of Tree Health and Dead Wood Continue Reading

This report describes the status and trends of forest tree health and dead wood in the Credit River Watershed based on data collected between 2009 and 2017.

IWMP Technical Report: Status and Trend Analysis of Tree Health and Dead Wood Continue Reading

Last modified:
2022-10-14

IWMP Technical Report: Status and Trend Analysis of Wetland Anuran Community

IWMP Technical Report: Status and Trend Analysis of Wetland Anuran Community Continue Reading

This report describes the status and trends of fluvial geomorphology in the Credit River Watershed based on data collected between 2010 and 2020.

IWMP Technical Report: Status and Trend Analysis of Wetland Anuran Community Continue Reading

Last modified:
2022-10-14

IWMP Technical Report: Status and Trend Analysis of Wetland Plant Community

IWMP Technical Report: Status and Trend Analysis of Wetland Plant Community Continue Reading

This report describes the status and trends of the wetland plant community in the Credit River Watershed based on data collected between 2005 and 2017.

IWMP Technical Report: Status and Trend Analysis of Wetland Plant Community Continue Reading

Last modified:
2022-10-14

IWMP Technical Report: Status Trend and Analysis of Forest Breeding Bird Community

IWMP Technical Report: Status Trend and Analysis of Forest Breeding Bird Community Continue Reading

This report describes the status and trends of the forest breeding bird community in the Credit River Watershed based on data collected between 2002 and 2015.

IWMP Technical Report: Status Trend and Analysis of Forest Breeding Bird Community Continue Reading

Last modified:
2022-10-14

Lake Ontario Integrated Shoreline Strategy Characterization Report

Lake Ontario Integrated Shoreline Strategy Characterization Report Continue Reading

This report characterizes existing conditions of the natural features and their functions within the LOISS study area. This characterization updates the summary provided in the Background Review with findings from studies undertaken to address the data gaps it identified.to the extent feasible (considering access to survey sites and funding limitations). This phase also included the development and implementation of an extensive Communications Strategy aimed at engaging the general public and key LOISS stakeholders.

Lake Ontario Integrated Shoreline Strategy Characterization Report Continue Reading

Last modified:
2018-12-03
Size:
11.95 MB

Lakeview LID Infrastructure Performance and Risk Assessment – Technical Report

Lakeview LID Infrastructure Performance and Risk Assessment – Technical Report Continue Reading

Technical report of Lakeview road right-of-way low impact development retrofit project monitoring results.

Lakeview LID Infrastructure Performance and Risk Assessment – Technical Report Continue Reading

Size:
19.94 MB

Lessons Learned: CVC Stormwater Management and Low Impact Development Monitoring and Performance Assessment Guide

Lessons Learned: CVC Stormwater Management and Low Impact Development Monitoring and Performance Assessment Guide Continue Reading

This guide is intended to assist practitioners and decision makers with developing stormwater monitoring plans to demonstrate due diligence, reduce risk and liability, and inform asset management decisions.

Lessons Learned: CVC Stormwater Management and Low Impact Development Monitoring and Performance Assessment Guide Continue Reading

Last modified:
2023-10-19

Living by the Lake Action Plan: 2019-2039

Living by the Lake Action Plan: 2019-2039 Continue Reading

This Action Plan lays out recommendations to conserve, enhance and restore the health of the Mississauga shoreline to direct and coordinate our collective efforts based on the best available science. It builds on existing partnerships with stakeholders to take on conservation actions collaboratively.

Living by the Lake Action Plan: 2019-2039 Continue Reading

Last modified:
2018-12-03

LOISS Assessment of Coastal Engineering Structures (GHD 2015)

LOISS Assessment of Coastal Engineering Structures (GHD 2015) Continue Reading

The LOISS recommnded an assessment of structures on public land owned or managed by CVC. The study consists of the following components:
• Development of an inventory of the shoreline protection structures;
• Assessment of the condition and effectiveness of the structures;
• Recommendations of opportunities for replacement or conversion of shoreline structures
• with the goal of shoreline naturalization; and,
• Recommendations for long term monitoring of the structures.

LOISS Assessment of Coastal Engineering Structures (GHD 2015) Continue Reading

Last modified:
2015-02-02
Size:
15.6 MB

LOISS Assessment of Coastal Engineering Structures (Shoreplan 2015)

LOISS Assessment of Coastal Engineering Structures (Shoreplan 2015) Continue Reading

The LOISS recommended creating an inventory of shoreline protection structures on public and selected private lands within the CVC watershed. An initial assessment report of six sites was prepared in 2014. This report is continuation of that work and considers fourteen sites.

LOISS Assessment of Coastal Engineering Structures (Shoreplan 2015) Continue Reading

Last modified:
2016-12-01
Size:
19.77 MB

LOISS Credit River Estuary Report

LOISS Credit River Estuary Report Continue Reading

The principal purpose of this report is to identify restoration opportunities within the Credit River estuary and adjacent tablelands centred on species at risk and species of conservation concern.

LOISS Credit River Estuary Report Continue Reading

Last modified:
2014-03-24
Size:
12.62 MB

LOISS Moore Creek Fluvial Geomorphology

LOISS Moore Creek Fluvial Geomorphology Continue Reading

This report responds to a recommendation from LOISS to gain insight into the interaction of the watercourses and Lake Ontario, to identify watercourses most sensitive to backwater from the lake, and to identify watercourses providing the highest sediment inputs to the shoreline. Since Moore Creek is contained within private property of the Lorne Park Estates and access permission had not been established, this creek was not assessed during the LOISS study. The fluvial geomorphic assessment of Moore Creek was consequently identified as a data gap. CVC was subsequently granted access to Moore Creek and retained Aquafor to undertake this study to complement the LOISS dataset.

LOISS Moore Creek Fluvial Geomorphology Continue Reading

Last modified:
2014-10-14
Size:
19.07 MB

LOISS Shoreline Recession Monitoring Report

LOISS Shoreline Recession Monitoring Report Continue Reading

To provide baseline information to establish a recession monitoring program for the entire CVC watershed shoreline. The recession monitoring was recommended to fill a data gap identified in the LOISS. The project consists of two components: 1) a field monitoring program; and 2) photogrammetric monitoring program.

LOISS Shoreline Recession Monitoring Report Continue Reading

Last modified:
2012-02-01
Size:
34.93 MB

Public Lands LID Infrastructure Performance and Risk Assessment – Technical Report

Public Lands LID Infrastructure Performance and Risk Assessment – Technical Report Continue Reading

Technical report of Public Lands low impact development retrofit project performance evaluation.

Public Lands LID Infrastructure Performance and Risk Assessment – Technical Report Continue Reading

Size:
11.01 MB
Scroll to Top