2023 Annual Report, Our Future Together
Credit Valley Conservation’s 2023 Annual Report highlights key accomplishments and features stories of our work to show how we are delivering on our new strategy.
Credit Valley Conservation’s 2023 Annual Report highlights key accomplishments and features stories of our work to show how we are delivering on our new strategy.
This report describes how CVC is addressing important stormwater challenges in the Credit River watershed.
Advancing Low Impact Development as a Smart Solution for Stormwater Management Continue Reading
Overview of Alton Village low impact development marketing strategy.
Alton Village LID Marketing Strategy Case Study Continue Reading
Using inventory data, the total tons of carbon stored in Credit River watershed’s forests and plantations was estimated, and predicted up to 2030.
Report assessing the existing standards for stormwater management and their ability to integrate floodresiliency and climate change solutions with the aim to support Partners in building stormwater systemresilience.
Literature review providing background information and initial analysis of the suitability of CVC’s head office building to implement a smart blue roof.
The technical and financial feasibility study and assessment of smart blue roof implementation, both for CVC’s head office and for the broader industrial, commercial and institutional sector (IC&I). It also covers a structural and building science capacity analysis of the CVC administrative office and a review of public and private sector benefits of implementing smart blue roof technology.
Summary of natural, cultural, social and economic information for Belfountain Conservation Area
Belfountain Complex Management Plan – Background Report Continue Reading
This document supports the Strategic Directions – Phase I Report.
Belfountain Complex Management Plan – Strategic Directions – Phase I Appendices Continue Reading
This report summarizes public and stakeholder input and outlines options for concept plans.
Belfountain Complex Management Plan: Strategic Directions Report – Phase 2 Continue Reading
This document supports the Strategic Directions – Phase 2 Report.
The Environmental Study Report summarizes each stage of the Class Environmental Assessment and provides a record of all stakeholder consultation.
This report outlines guiding principles, identifies key actions and discusses proposed projects.
Belfountain Management Plan: Strategic Directions Report – Stage 1 Continue Reading
This study uses two case study locations in Peel Region to make a business case for the management of natural assets under various risk and climate change scenarios. Appendices 1-3 of the report describe the Rapid Condition Assessment Methodology developed by CVC.
Overview of monitoring low impact development features at IMAX demonstration site.
Case Study: Monitoring Low Impact Development at the IMAX Demonstration Site Continue Reading
Overview of Central Parkway low impact development retrofit project featuring Silva Cell technology.
Technical report of Central Parkway road right-of-way low impact development retrofit project monitoring results.
Monitoring plan for Central Parkway road right-of-way low impact development retrofit project evaluating the effectiveness of the Silva Cell and bioretention feature.
PDF of Case Study- LID- Green Glade for teacher activity guide for Low Impact Development climate change solutions series.
Cimate Change Solutions: Low Impact Development Case Study – CVC Head Office Continue Reading
This study used a comparative analysis between two deicing treatments: sand-salt mixture and salt treated with magnesium chloride.
Overview of Clairfields, Westminster Woods and Pine Ridge Subdivision projects featuring large-scale infiltration practices called “greenways.”
Clairfields, Westminster Woods and Pine Ridge Subdivisions Case Study Continue Reading