Class Environmental Assessment for Belfountain Dam and Headpond Area
Project Approved Credit Valley Conservation has now completed the planning and design process approved for the Belfountain Dam and Headpond Class Environmental Assessment. |
In addition to the management plan for the complex, CVC is planning a Class EA for the Belfountain Dam and Headpond area. It will address safety concerns and environmental impacts of the dam. It will also address natural, cultural, social, environmental and economic features.
Technical Reports
- Technical Report 1 – Baseline Inventory
- Technical Report 1 – Appendices
- Technical Report 2 – Management Alternatives
- Technical Report 3 – Implementation Options and Detailed Assessment of Environmental Effects
Class Environmental Assessment
- Environmental Assessment – September 22, 2105
- Environmental Assessment – Preferred Alternative – March 24, 2016
- Environmental Assessment – Preferred Alternative – May 12, 2016
- Environmental Assessment – Draft Environmental Study Report – November, 2016
- Environmental Assessment – Draft Environmental Study Report Appendices – November, 2016
Environmental Study Report – Belfountain Dam & Headpond Class Environmental Assessment
- Appendix ‘A’ – Public Consultation
- Appendix ‘B’ – Photographic Catalogue
- Appendix ‘C’ – Hydrology & Hydraulics
- Appendix ‘D’ – Structural Engineering
- Appendix ‘E’ – Geotechnical Engineering
- Appendix ‘F’ – Stream Morphology & Sediment
- Appendix ‘G’ – Aquatic Ecology
- Appendix ‘H’ – Terrestrial Ecology
- Appendix ‘I’ – Cultural & Built Heritage
- Appendix ‘J’ – Archaeology
- Appendix ‘K’ – Financial
- Appendix ‘L’ – Alternative Cost Estimates & Visualizations
- Appendix ‘M’ – Implementation Options
- Appendix ‘N’ – Preliminary Design
- Figures